Aquanet II S.A.

The design and construction of the Central Dispatch Building, along with the renovation of the “on the slope” building at the SUW Wiśniowa site in Poznań, was an advanced undertaking that encompassed comprehensive construction and technical activities.

The project completion period was 16 months from the signing of the contract, allowing for the careful execution of each stage of the project. Under the contract, the following works were carried out:

  • Construction and execution design covering a wide range of disciplines: architectural, structural and civil engineering, sanitary installations, electrical systems, telecommunication systems, as well as automation, control, and measurement (ACM).

This complex project was executed in compliance with the highest quality standards, ensuring not only functionality but also aesthetics and long-term durability of the facilities.

Duration of implementation

2017 - 2018

Address

ul. Dolna Wilda 126, Poznań

Powierzchnia

1 659 m2

Investor

Aquanet S.A

Project

PTB Nickel Sp. z o.o.

Osoba odpowiedzialna